CHEONG, Y. W.; KWAN, H. P.; HARIYANTO, A. D. QUALITY CONTROL IN PRECAST PRODUCTION A case study on Tunnel Segment Manufacture. DIMENSI (Journal of Architecture and Built Environment), [S. l.], v. 33, n. 2, 2005. DOI: 10.9744/dimensi.33.2.%p. Disponível em: https://dimensi.petra.ac.id/index.php/ars/article/view/16355. Acesso em: 29 apr. 2024.