[1]
Cheong, Y.W. et al. 2005. QUALITY CONTROL IN PRECAST PRODUCTION A case study on Tunnel Segment Manufacture. DIMENSI (Journal of Architecture and Built Environment). 33, 2 (Dec. 2005). DOI:https://doi.org/10.9744/dimensi.33.2.%p.